Xpeed Commercial Boxing Frame — Installation Guide
⚠ Important:
Installation should be completed by a competent person with experience in fixing heavy-duty equipment. Incorrect installation may result in injury or product damage.
Tools & Hardware Required
-
150mm x M12 Thunderbolt anchors (recommended: 4 pieces)
-
Hammer drill with masonry bit (12mm)
-
Socket wrench or spanner (19mm)
-
Spirit level
-
Marker or chalk
-
Protective equipment (safety glasses, gloves, ear protection)
Step-by-Step Installation
-
Position the Frame
-
Place the frame in the desired location, ensuring adequate clearance around the punching bag for safe training.
-
Check for overhead clearance of at least 60cm above the bag.
-
-
Mark Mounting Points
-
Use a spirit level to ensure the upright is vertical.
-
Mark the four base plate holes on the floor.
-
-
Drill Anchor Holes
-
Using a hammer drill with a 12mm masonry bit, drill holes to the required depth for the Thunderbolt anchors (approx. 150mm).
-
Remove dust from holes to ensure a secure fit.
-
-
Install Anchors
-
Position the frame over the drilled holes.
-
Insert Thunderbolt anchors through the base plate holes and tighten with a socket wrench until fully secure.
-
-
Check Stability
-
Ensure the frame is firmly fixed and level.
-
Test the rotation mechanism of the bag attachment before hanging the punching bag.
-
-
Attach the Punching Bag
-
Hang the bag according to the manufacturer’s instructions.
-
Double-check all fixings before first use.
-